Reference List Hyperbaric Tunneling
M-518 TENP, Section 4/5, Lörrach |
2002 |
Germany |
|
M-518 TENP, Section 4/5, Lörrach
Trans European Natural Gas Pipeline
|
Manufacturer: | Herrenknecht |
Machine Type: | AVN 2000 |
Country: | Germany |
Year: | 2002 |
Diameter: | 3.04 m |
Length: | 0,390 km |
Geology: | Gompholite, Gravel, Sand |
The parallel pipe of the TENP (Trans-European Natural Gas Pipeline) between Bahlingen-Thiengen and Hüsingen-Wallbach crosses the Rhine at Schwörstadt. The tunnel was driven with a hydroshield TBM with segment lining. The tunnel was 3.0 m in diameter and around 390 m long.
|